// Template Name: Project Single ?>
The project consisted of full installation of new heating system, lighting, data, fire alarm, flooring, WC’s, new fixed/loose furniture with full decoration and signage to the existing Medical Centre. These works were completed over 6 phases with the Medical Centre fully operational throughout all phases of the refurbishment works.
| Location | Wakefield |
| Project | Refurbishment |
© Togel Contractors 2025
Website design and build by Grey Matter | web design sheffield