// Template Name: Project Single ?>
The works consisted of a full strip out, installation of new timber flooring, the refurbishment, clean, vitrify and seal of the existing stone floors, revival of all existing timber wall panels, full internal decorations, bespoke fixed seating works and the installation of a feature bioethanol fire, including surround. Bespoke doors, window dressings and a full bar were manufactured in our joiners shop.
The 6-week programme was completed across days and nights, to ensure the hotel could remain open, with minimal disruption, to guests.
| Location | Birmingham |
| Project | Refurbishment |
© Togel Contractors 2025
Website design and build by Grey Matter | web design sheffield